Concrete + Foundation
Job Description
**What's Included in This Contract** All footings (continuous and spread per schedule on S-101) All foundation walls (per schedule on S-101) Lintels (per schedule on S-101) Basement slab (~2,480 SF, 3.5" minimum over 6-mil vapor barrier) Garage slab (~840 SF, 8" thick, #4 @ 16" O.C. grid per S-101) Porch cap (detail 116 on R-102) Anchor bolts and Simpson hardware installation (HDU5, STHD10RJ, ABU88Z, CPT66Z — see plans for counts and locations) Garage apron / driveway slab and walkways Waterproofing & drainage (see below) **What's NOT in This Contract** Excavation and backfill (separate contract, already bid) Under-slab gravel/compaction (excavation contractor's scope) Framing, lumber, or anything above the mudsill Plumbing and electrical rough-ins (by others, but coordinate timing) Sump pump installation (plumber scope — but see note on pit rough-in below) **Additional Info** Waterproofing / Dampproofing: Contractor is responsible for exterior foundation wall waterproofing per IRC 406. Apply membrane after form stripping, before backfill. This includes dampproofing or waterproofing membrane on all below-grade walls. Footing Drains: Perimeter footing drain system with perforated pipe, filter fabric, and gravel bed. Connect to daylight discharge or sump pit location. Coordinate routing with site drainage plan **IF NEEDED** Vapor Barrier: 6-mil poly under basement slab is contractor's scope. Lap seams 6" minimum, seal penetrations. Sump Pit Rough-In: Please include a line item for forming and placing a sump pit (crock/basin) in the basement slab. Location TBD — coordinate with footing drain routing. Pump installation is by plumber later, but the pit must go in before the slab pour. Radon: Excavation contractor is roughing in radon piping under the slab. Concrete contractor to coordinate around radon pipe penetration through basement slab and seal accordingly. Garage Slab Isolation Joint: Garage slab is 8" thick (thicker than basement). Confirm your approach to the isolation joint where garage meets foundation wall. Driveway Finish: Broom finish unless otherwise discussed. If you offer stamped or exposed aggregate, please include as an alternate. Porch Cap: Per detail 116 on R-102. Please confirm this is included in your bid or call out separately. **Also include price for driveway slab & walkway slab** I may go asphalt, may not. ****IF ANY OF THIS LOOKS OFF, PLEASE ASK QUESTIONS!!****
Contact the Owner/Builder:

Project: Brines Residence Address: 9218 Henley Street, Victor, ID 83455 Lot: 5, Golf Vista Estates Phase 1 | 0.46 Acres | RS16 Zoning Building: 4,959 Basement + Main (2,479 Main + 2,480 Basement - unfinished) + 840 SF Attached Garage Construction Type: Stick-Frame Residential, Full Basement, Sewer Connected Code: IRC 2018 | Frost Depth: 36" | Seismic: D1
Ready to bid on this job?
Submit your bid directly and the project owner will be notified


