Jambr|Contractor Marketplace

Site Work / Excavation

Victor, IDStart: April 2026
Labor OnlySite & Foundation

Job Description

Please download plans!! Scope Project ties into city water/sewer + electrical (at street) Single-vendor site work package covering all earthwork from mobilization through rough grade: Mobilization & site prep — clear building envelope, construction entrance, temp fencing Topsoil strip & stockpile — strip footprint and driveway areas, stockpile on-site for reuse Foundation excavation — full basement dig per plans, including over-dig for formwork Utility trenching — sewer, water, gas, electric from house to connection points Backfill & compaction — approved material, compacted in lifts to 95% Proctor Rough grade — positive drainage from foundation, prep for flatwork and landscaping Propane tank burial — excavate, sand bed, backfill. **The idea is to construct a "rough" berm on the south west corner (as an L) with excess material.** Driveway base — road base install and compaction (~1,200 SF) Haul-off — remove excess spoils not suitable for backfill **Project Owner may want to bring house "up" from grade. Confirm height of pad for house before job begins** Bid Requirements Unit-price breakdown is ideal Estimated start date (rough okay) and duration Insurance certificate (GL $1M min + workers' comp)

Project Details
Henley Build

Project: Brines Residence Address: 9218 Henley Street, Victor, ID 83455 Lot: 5, Golf Vista Estates Phase 1 | 0.46 Acres | RS16 Zoning Building: 4,959 Basement + Main (2,479 Main + 2,480 Basement - unfinished) + 840 SF Attached Garage Construction Type: Stick-Frame Residential, Full Basement, Sewer Connected Code: IRC 2018 | Frost Depth: 36" | Seismic: D1

Address:9218 Henley St
Size:2,500 sq ft
Timeline:Summer 2026
Project Documents
Plans and specifications for the overall project
Project Photos

Ready to bid on this job?

Submit your bid directly and the project owner will be notified